Seiko LP-1020L Betriebsanweisung Seite 46

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 290
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 45
2-4
Power on
1 Turn on the Main power switch located at the lower-left
as seen from the rear of the device.
Press the power switch toward the
symbol (upwards).
2 Press the power key located on the control panel of this
device (when the main power switch is on).
When you first turn on the power after purchasing this device, a guidance
display prompts you to set the panel's display language. If this setting has
already been completed, this message is omitted.
LANGUAGE?
ENGL I SH
INITIALIZING
WA I T A MOME N T
Main power switch
Seitenansicht 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 289 290

Kommentare zu diesen Handbüchern

Keine Kommentare